Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "000-228" Exam

p5 and pSeries Technical Sales Support

 Question 1.
ITCertKeys.com requires a 2-way solution now that will be the easiest and least disruptive to upgrade to a 4-way in the future. 

Which of the following solutions best matches these requirements?

A. P5-510 2-way Active 2-way Inactive
B. P5-570 2-way Active 2-way Inactive
C. P5-520 2-way Active 2-way Inactive
D. P5-55A 2-way Active 2-way Inactive

Answer:  B

Question 2.
A System p customer has an 8-way P550 running an application for about 200 users; the required amount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a new database will be added to the p550. 

What is the most likely result of this projected growth next year?

A. User demand will increase 30%
B. Processor demand will increase 10%
C. Disk usage will increase more than 10%
D. Memory demand will increase more than 10%

Answer:  D

Question 3.
ITCertKeys.com plans to order several new system p servers and is concerned that the additional head load may exceed the capacity of the current air-handling system. 

Which of the following resources aid the customer in addressing this concern with their personnel?

A. System P Q & A to identify system requirements for each new server
B. Facts and Features for each system to identify the power requirements
C. Redbooks to confirm that enough space is available in the rack to allow for proper airflow
D. Physical site planning section in the IBM Systems hardware Information Center for each server

Answer:  D

Question 4.
ITCertKeys.com will be using IBM DS4500 storage subsystem. In order to provide the highest data availability for a database server, which of the following is the most appropriate hardware RAID technology to recommended?

A. RAID 1
B. RAID 5
C. RAID 0
D. RAID 10

Answer:  D

Question 5.
A System P customer plans to install a partitioned p550 alongside older POWER4 servers. 

The customer wants to verify the existing HMC (7315) will connect to the old and new servers which of the following will address this issue?

A. Add a new HMC for the POWER5 system
B. Purchase additional serial connections to the HMC
C. Purchase additional Ethernet connections to the HMC
D. Update the HMC firmware update to support both POWER4 and POWER5

Answer:  A

Question 6.
Which of the following services offers customer personnel scheduled telephone support for complex questions on AIX systems?

A. Techline
B. Consultline
C. Account Advocate
D. Operational Support Services - Alert for pSeries

Answer:  B

Question 7.
Which of the following lists of items all require an HMC to function with POWER5?

A. Running AIX 5.3
    Implementing HACMP
    Implementing Static LPAR
B. Implementing Advanced POWER Virtualization
    Running Linux
    Attaching RIO Drawers
C. Implementing VIO Server
    Implementing Dynamic LPAR
    Running with SMT Turned "ON"
D. Running AIX and Linux on same System
    Implementing trail CoD
    Implementing Micro-Partitioning

Answer:  D

Question 8.
ITCertKeys.com whishes to replace 12 older small UNIX systems. They are running out of floor space in their data center. The applications are supported on all AIX versions. 

Which of the following System P servers would best meet the customer's requirements?

A. P5-p570 running APV
B. P5-P55A running AIX 5L V5.3
C. Rack mounted P5-P520's running DLPAR
D. P5-p185 running AIX 5L v5.3 with VIOS

Answer:  A

Question 9.
ITCertKeys.com has an HMC controlling numerous POWER4 servers running different AIX versions. They plan to move POWER5. 

Which of these options would position them for the migration?

A. Upgrade to AIX 5.2
B. Upgrade to AIX 5.3 with APV
C. Reload Microcode on HMC to support POWER5
D. Install a new HMC to support both POWER4 and POWER5

Answer:  A

Question 10.
A Request for hardware proposal with a very short lead time includes several non workable hardware specifications. 

Which of the following will address this issue?

A. Decide not to bid
B. Provide the hardware bid as specified
C. Bid with recommended changes identified
D. Meet with the customer to discuss options

Answer:  C



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.