Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "50-639" Exam

MOTA SPEAKS OUT!

 Hi! I passed my CNA exam today and let me tell you, what a breeze of an exam. I was actually insulted because anyone willing to study for 1 hour of the right material could pass this exam. Even though the hour earlier they never heard of Novell before. I feel as if this certification has no value. I got 15 out of 15 right in 7 minutes, I actually spent more time on the rediculous 42 question survey afterwards.
I studied all 338 questions on exam essentials and all the recent dump before I wrote this exam. I'm telling you just study the certsbraindumps and you'll be ok.

I would like to thank the dumps of:
Malik
Goodluck to you all! 


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for 646-573 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "646-573" Exam

Cisco Lifecycle Services Advanced Security

 Question 1.
Which two key tasks belong to Acceptance Testing? (Choose two.)

A. Get Acceptance from the Customer for the Design and Project Plan
B. Coordinate Required Customer Involvement
C. Proof of Concept
D. Stage Equipment
E. Tune Policies Further if Needed

Answer: B, E

Question 2.
What describes the Business Requirements Development service component in the prepare phase?

A. meetings with different customer stakeholders to gather the customer's requirements for the 
     security solution
B. a process by which the partner can determine if the security solution that is being proposed 
     matches the customer's security requirements
C. the creation of a topology map for the solution and the identification of products and services 
     that will be required to implement the solution
D. a process that identifies the customer's security reporting requirements
E. the creation of a model network that replicates the proposed security solution

Answer: A

Question 3.
Which task is conducted as part of developing a detailed design for IPS or IDS?

A. Identify SQL Server Requirements
B. Define Sensor Maintenance Procedures
C. Review LAN/WAN Configurations
D. Define Configuration Database Design

Answer: B

Question 4.
Your boss at ITCertKeys, Mrs. ITCertKeys, is curious about flow of events for a CSA policies and groups implementation. 

What is the correct order?

 

Answer:

 

Question 5.
Which task is performed during the development of a detailed design for CSA?

A. Determine CSA Feature and Function Design Specifications
B. Define Policies and Groups
C. Review and Generate an IP Addressing Scheme
D. Determine Network Availability/Redundancy Specifications

Answer: B

Question 6.
Which service component should be executed before Change Management?

A. Operations Design
B. Operations Setup
C. Operation Assessment
D. Escalation Process

Answer: B

Question 7.
What is the first activity that is conducted in an IPS mode implementation?

A. Fine Tune the Custom Policy
B. Tune for False Positives
C. Create a Rule from a Query
D. Install the Sensor, Schedule a Network Outage Prior to the Installation

Answer: D

Question 8.
Which two tasks are parts of the (CSA) Security System Installation? (Choose two.)

A. Identify a Set of Systems That Will Be Protected in a Pilot Implementation Based upon 
     Guidelines
B. Determine CSA Feature and Function Design Specifications
C. Identify SQL Server Requirements
D. Ensure Specified CSA Network Connectivity Requirements Are Met

Answer: A, D

Question 9.
Which resource is most often used during the Detailed Design Development: Feature/Functionality Design Development?

A. Site Survey
B. Acceptance Test Plan
C. Product Configuration Checklist
D. System Readiness Assessment Report
E. Business Requirements Document

Answer: C

Question 10.
For a security solution, which task is associated with the Business Requirements Development service component in the prepare phase?

A. Review Security Alerts and Notification Requirements
B. Document Current Topology, Hardware and Software
C. Document System Level Functionality
D. Analyze the Security Solution Integration Requirements with Existing Legacy Platforms
E. Assess Technical Requirements for the Proposed Security Solution

Answer: C



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.