|
Question 1.
File system fs01 is 1 TB and quotas are not currently required. If this changes, however, configure quotas at a later time must not be affected. How do you satisfy this requirement?
A. Do not enable quotas when fs01 is created. Turn on quotas at off peak hours when enabling.
B. Enable quotas when fs01 is create. Then pause the quota service on the Data Mover.
C. Do not enable quotas when fs01 is created. Use the "param quotas Background Process=1"
parameter when they are enabled.
D. Enable quotas when fs01 is created. Do not set any quota limits.
Answer: D
Question 2.
You can access the hidden ".ckpt" directory, which is created by Snap Sure, using which two of the following methods? (Choose two)
A. Append .ckpt to the path shown when mapping a network drive.
B. Enter the entire path into Start > Run > \\serverx\SnapSure\ckpt
C. Browse to the .ckpt directory using Windows Explorer
D. Type the entire path directly into the Address bar in Windows Explorer
Answer: B, D
Question 3.
Of the following, which three are NOT configuration rules for NAS System LUNs on an
NS system? (Choose three)
A. LUNs within the System RAID Group must be owned alternatively by SPA and SPB
B. Celerra Control LUNs must be configured on a dedicated NAS 4+1 Raid5 group
C. LUNs in the System RAID Group must be divided into 2, 4 or 8 equal LUNs
D. LUNs within the System RAID Group are not restricted to SAN or NAS
Answer: A, C, D
Question 4.
Windows users' home directories are configured on a Celerra CIFS server by using which procedure?
A. Configure the homedir file with the path for each domain user. Enable the home directory
option on the Data Mover. Create a directory in the correct location for each user. Edit the
profile of each existing user's account.
B. Configure the homedir file with the path for each domain user. Enable the home directory
option on the Data Mover. Export the appropriate path as the share name HOME. Edit the
profile of each users account.
C. Configure the homedir file with the path for each domain. Export the path as the share name
HOME. Enable the home directory option on the Data Mover. Edit the profile of each user's
account using the %user% variable.
D. Configure the homedir file with the path for each domain. Enable the home directory option on
the Data Mover. Create a directory in the correct location for each user. Edit the profile of each
user's account using the %user% variable.
Answer: A
Question 5.
Virtual Data Mover's root file system stores which of the following?
A. Usermapper configuration
B. NTP
C. FTP root directory
D. Local Groups
Answer: D
Question 6.
In which location would you find Internal Usermapper?
A. at the Virtual Data Mover level
B. on the Control Station
C. at the physical Data Mover level
D. spread over all Usermapper servers
Answer: C
|
Question 1. Which service component within the design phase does the following describe? Consider the customer's defined business requirements and the associated performance, availability, resiliency, maintainability, resource capacity, and security criteria used to measure and assure the delivery of the required services. A. Staging Plan B. Implementation Plan C. Business Plan D. Detailed Design Validation E. Project Kick-off Answer: B Question 2. Which service component within the prepare phase validates the features and functionality documented in the high-level design of a solution? A. Proof of Concept B. High-level Design Development C. Business Case Development D. Business Requirements Development E. Operations Technology Strategy Development F. Technology Strategy Development Answer: A Question 3. In the implement phase, project close-out involves which of the following tasks? A. deliver education based on Staff Planning Development reports B. conduct Engagement Profitability Assessment C. execute network migration plan D. customize ongoing support hand-off kit Answer: B Question 4. In the implement phase, project close-out involves which of the following tasks? A. deliver education based on Staff Planning Development reports B. customize ongoing support hand-off kit C. conduct Engagement Profitability Assessment D. execute network migration plan Answer: C Question 5. In the design phase, performing a needs analysis to identify the resource requirements and skills needed to deliver and support a network infrastructure is an activity of which service component? A. Implementation Kick-off Meeting B. Implementation Plan C. Project Kick-off D. Staging Plan E. Migration Plan F. Staff Plan Development Answer: F Question 6. In the implement phase, solution implementation involves which of the following task? A. Execute test cases B. Configure core products C. Perform preliminary Site Assessment D. Analyze high-level design and technology requirements of the customer Answer: B Question 7. Which one of the following describes the task for completing an operations readiness assessment in the plan phase? A. determining network elements that will be tested B. reviewing hardware and software configuration staging plan C. entering documentation into knowledge management system D. developing backup/recovery plan E. creating an escalation plan F. obtaining and reviewing operation procedures and policies Answer: F Question 8. In the implement phase, solution implementation involves which of the following task? A. perform preliminary Site Assessment B. configure core products C. execute test cases D. analyze high-level design and technology requirements of the customer Answer: B Question 9. Which of the following definitions best describes services stack within the Cisco Lifecycle Services approach? A. the minimum set of services that a customer needs to successfully deploy and operate a Cisco technology or solution B. the required set of services needed to successfully deploy and support Cisco Advanced Technologies C. the identification of Advanced Technologies to best support business requirements and objectives D. the minimum set of services required to operate and optimize Cisco Advanced Technologies Answer: A Question 10. Which of the following definitions best describes business requirements development within the prepare phase? A. a set of service component activities that assesses and documents the business requirements of a customer B. part of the systems design activity that identifies and documents business requirements to help deploy network technologies C. part of the high-level design activity that addresses business and technical requirements of the customer D. a service component activity that analyzes business requirements and recommends the appropriate technology strategy Answer: A
Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.