Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "PB0-200" Exam

APC latest dump

 Question 1.
Which two service advantages does a Symmetra UPS within Infrastruxure offer over traditional solutions?

A. Mean time repair is reduced
B. Built-in redundancy reduces component failures
C. The service bypass panel allows isolation of UPS
D. The required a Skill level for troubleshooting is reduced.

Answer: A, B

Question 2.
An enterprise data center manager is in charge of 47 production server several switches hubs routers and workstations.

The computer room is backed up by a symmetra PX 40KW with an external battery cabinet giving a runtime of about 22 minutes at full load. They do not have a generator. Forty-two of the 47 servers are critical and the manager wants to shut them down gracefully using his LAN, in order to not damage the operating systems.

Which application would you recommend?

A. Enterprise MANAGER
B. Power Chute Business Edition
C. Power Chute Network Shutdown
D. Power Chute Professional Edition

Answer: C

Question 3.
An office building has a chiller plant that supplies chilled water throughout the building for general cooling of the occupied spaces. The chilled water is not available outside regular business hours. A tenant is planning to occupy an office in the building,. The new tenant has a computer room for their IT support equipment that occupies 10 racks at an average of 2.7 KW per rack and runs 24 hours a day.

Which solution provides the greatest efficiency and reliability for the computer room?

A. roof-top unit
B. chilled-water unit
C. ceiling-mounted unit
D. glycol-cooled unit with economizer
E. refrigerant-based unit with secondary chilled-water cool

Answer: E

Question 4.
A site requires UPS power to feed a combination of desktop computer, existing rack mount server loads, and non-rack loads. Assume 35kw of combined load (20kw for servers and 15kw for PCs.) and a three -phase available source.

What is the highest available, easy-to=manage and easy-to-maintain solution?

A. all Smart-UPS and Back-UPS
B. one 40kw traditional UPS with one PDU for each load type
C. one 20kw three-phase single-module UPS system for each types of load
D. one 40kw N+1 Symmetra PX with overhead and under floor distribution

Answer: D

Question 5.
The basement air conditioning unit leaks water onto the data center floor. The facility manager wants to install a water sensor in the data center's basement and received e-mail notification through the company's LAN when there is water on the floor. The water sensor uses only normally open or normally closed contacts when water is detected.

What should the facility manager do?

A. connect a Network MANAGEMENT card for e-mail notification
B. install power net manager on an available computer for e-mail notification
C. connect a building management card to the water sensor for e-mail notification
D. connect an environmental monitoring unit to the water sensor for e-mail notification

Answer: D

Question 6.
ITCertKeys has a 15kw load requirement and wants a solution that will provide redundancy and room to expand.

Which solution provides enough capacity for a 15kw load and N+1 internal redundancy?

A. Symmetra PX with two power modules
B. Symmetra PX with three power modules
C. Symmetra Rack Mount with four power modules
D. Symmetra Rack Mount with three power modules

Answer: B

Question 7.
Exhibit:

 

Which diagram provides the best method of cooling the rack enclosures utilizing the Computer Room Air Conditioner (CRAC)?

A. I
B. II
C. III
D. IV

Answer: A

Question 8.
In an Infrastructure solution, what is the benefit of having two Main Intelligence Modules (MIMs)?

A. high available design
B. cleaner UPS output voltage
C. remote management of the UPS
D. integrated monitoring of distribution breakers

Answer: A

Question 9.
What is a 2N UPS system design?

A. a dual-input single module UPS
B. a parallel redundant UPS system consisting of two UPS modules
C. two independent UPS system feeding dual-corded power supplies
D. one single-module UPS feeding several dual-corded power supplies

Answer: C

Question 10. 
ITCertKeys has a 10-year-old computer room with a 30 cm raised-floor plenum.

They have just completed a change out of some IT equipment and also re-cabled much of the equipment with Cat5E and fiber. They are now having cooling problems in a few areas of the room.

What are two likely cause?

A. The new IT equipment draws air bottom to top, creating heat plumes around the racks
B. When the new cabling was added, the old cable was not pulled from the raised-floor plenum, 
     creating air dams.
C. Some of the new IT equipment is more dense and is generating more heat than the previous  
     equipment at that location.
D. The new fiber cable emits more heat than the previous copper network cabling, which causes  
     an increase in the temperature of the air leaving the perforated tiles.

Answer: B, C

Question 11.
Approximately how much cooling capacity does a 5-ton air conditioner have?

A. 12kw
B. 17kw
C. 20kw
D. 60kw

Answer: B

Question 12.
Exhibit:

 

What type of system is shown?

A. air cooled
B. water cooled
C. glycol cooled
D. remote condensing

Answer: A

Question 13.
Exhibit:

 

Which UPS topology is shown in the exhibit?

A. standby
B. line interactive
C. standby online hybrid
D. online double conversion

Answer: D

Question 14.
What is one advantage of using precision cooling rather than comfort cooling?

A. No humidity control is required
B. Reheat is available to increase humidity
C. Temperature control is within +/-0.5 degree Celsius (+/-1 degree Fahrenhit.)
D. Temperature control is within +/-0.3 degree Celsius (+/-5 degree Fahrenhit.)

Answer: C

Question 15.
What is the most common way rack-mounted IT equipment is cooled?

A. fans force air side to side
B. fans force air front to back
C. fans force air bottom to top
D. convection through its heat sinks front to back
E. convection through its heat sinks bottom to top

Answer: B

Question 16.
What is the correct formula to calculate Apparent Power (VA)?

A. Power (Apparent) = voltagexcurrent
B. Power (Apparent) =currentxResistance
C. Power (Apparent) =voltagexResistance
D. Power (Apparent) =currentxCapacitance

Answer: A

Question 17.
Exhibit:

 

Given the block diagram and the maximum load shown in the exhibit, what is the available power?

A. 20KW wired for capacity
B. 20KW wired for redundancy
C. 30KW wired for redundancy
D. 40KW wired for capacity

Answer: B

Question 18.
What is the accurate way to determine the capacity of an existing standby generator?

A. ask the facility manager
B. calculate 30% over the UPS capacity
C. look at the generator name plate in the genset room
D. calculate capacity based on the load the generator is powering

Answer: C

Question 19.
How many BTU/hr of heat does 25KW of IT equipment produce?

A. 850
B. 8,500
C. 85,000
D. 850,000

Answer: C

Question 20.
The Air Distribution Unit has its optimal effect when used in which application?

A. as a rack-mounted device to increase airflow in a raised-floor environment
B. as a rack-mounted device to increase airflow in a concrete floor environment
C. as a standalone device to increase airflow in a hot aisle/cold aisle arrangement
D. as a standalone device to increase static pressure in a raised-floor environment

Answer: A


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for PK0-003 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "PK0-003" Exam

Project+ (2009)

 Question 1
You are the project manager for your organization and are coaching Sam on the differences
between a project and operations. Which one of the following is the best definition of a project?

A. A project is a short-term endeavor to create a unique product or service.
B. A project moves through five phases: initiating, planning, executing, monitoring and controlling,
and closing.
C. A project creates a unique product or service for the organization's customers.
D. A project provides a service to the organization.

Answer: A

Question 2
Which of the following processes involves monitoring the progress of the project to identify any
variances in the project plan?

A. Closing
B. Controlling
C. Executing
D. Planning

Answer: B

Question 3
You are the project manager for the HNG Project. Your project is slated to last eight months but
management has asked that you create a method for reducing the project duration. You elect to
allow certain phases of the project to overlap. What schedule compression technique have you
used in this instance?

A. Crashing
B. Lag time
C. Resource leveling
D. Fast tracking

Answer: D

Question 4
2
You are a project manager for GTX project. The project has ten active stakeholders. How many
communication channels will be required for effective communication with the stakeholders?

A. 45
B. 2
C. 10
D. 9

Answer: A

Question 5
You are the project manager of manufacturing process. Your project will focus on the creation of
987,600 handheld printers to be used in grocery stores around the world. The printers are
manufactured largely by machine though there are several steps in the process where project
team members will need to manually configure the devices. Management will be completing
statistical sampling of the printers and they have established an upper control limit of 980 correct
out of 1,000 and a lower control limit of 970 out of 1,000. Your expected mean is 975. On a control
chart, which is what management expects you to create, what is called should your results exceed
980 correct out of a 1,000 in any given measurements?

A. Out of control
B. Failure mode
C. Improvement
D. Variance

Answer: A

Question 6
Which of the following is the last deliverable at the close out meeting?

A. Customer Feedback
B. Project approval
C. Lessons Learned
D. Source code of application

Answer: C

Question 7
3
You are the project manager of the NGQ Project and are reviewing the assignments for your
project team. You have decided to use a RACI chart as your responsibility assignment matrix.
What does RACI mean?

A. Responsible, Active, Confirmed, Inactive
B. Resource, Action, Communicate, Inform
C. Responsible, Accountable, Communicate, Inform
D. Responsible, Accountable, Consult, Inform

Answer: D

Question 8
You are the project manager of the NHH Project and you have 22 project team members on the
project. You need to identify a method to promote performance on your project and are examining
Herzberg's Theory of Motivation. What will happen in this theory to your project team's motivation
if you can remove the hygiene agents according to Herzberg's Theory?

A. The motivation of the team will excel once the hygiene agents are removed.
B. The motivation of the team will excel - if they're interested in the project's goals.
C. There will be no change in the team's motivation.
D. The motivation of the team will decrease.

Answer: D

Question 9
Which of the following process groups of the project management processes utilizes the most
project time and resource?

A. Planning
B. Initiation
C. Closing
D. Executing
E. Controlling

Answer: D

Question 10
A construction company is about to start a new project. It requires hiring a project manager for this
project. Which of the following are the most important skills that a person must have to be selected
4
as a project manager?

A. Team building and human resources
B. Leading
C. Problem solving
D. Negotiation and influential
E. Communication

Answer: E



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.