Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "1Z0-030" Exam

Passed exam with 100%.

 Passed exam with 100%.
thanks for itcertkeys
buddy


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for E20-815 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "E20-815" Exam

Business Continuity Expert Exam for Technology

 Question 1.
You are assisting a customer who has a Symmetrix 8530 to write its DR plans. The customer's SRDF recovery site includes both unprotected R2 and unprotected BCV devices. 

The customer's concerns in priority are:
1) Protection from mistakes during application recovery at the DR site
2) Protection from hardware failures at the DR site.

Upon a site failover, what is the best action to take before beginning application recovery?

A. Ensure sufficient cache capacity to meet performance requirements
B. Establish, then split, all BCV devices from their R2 partners
C. Establish all R2 and BCV pairs to protect against device failures
D. Create TimeFinder Snaps of all R2 devices

Answer: B

Question 2.
W. Pane Corporation is a Windows 2003 environment. W. Panes' servers are SAN Attached to a DMX2000P running Fibre Channel direct attached SRDF/S over 5km to another DMX2000P. The web servers that boot from the SAN are experiencing higher response times than those that do not. 

What is the most likely the cause? 

A. Paging space is being replicated
B. High latency on the link
C. Insufficient SRDF Ports
D. Fibre Channel Protocol overhead

Answer: A

Question 3.
GZR Corporation has a large Oracle data warehouse that extends across multiple Symmetrix arrays. Replication Manager will be utilized to create a replica for backups. Because of the custom application, pre- and post-processing scripts are required. The database must be brought offline prior to the split. 

Which three [3] conditions are required to successfully create a replica?

A. Pre-Processing scripts need to contain freeze or shutdown commands
B. Oracle archive mode is not required
C. No special Pre-Processing commands are required
D. Oracle archive mode is required
E. Post-Processing scripts need to contain thaw or startup commands
F. No special Post-Processing commands are required

Answer: A, B, E

Question 4.
BB Corporation is consolidating six Solaris 8 systems from direct connect storage on multiple 3830 arrays to a single DMX2000 array (70+ microcode) with FC-SW connectivity. Currently BB is reviewing fan-in for servers to storage ports for evaluation. Each Solaris system will have four HBAs, PowerPath used for path redundancy, 400 volumes per server. 

What is the minimum number of ports needed for redundancy to maximize port utilization?
 
A. 4
B. 8
C. 2
D. 12

Answer: D

Question 5.
What are three [3] items that determine a customer's Recovery Time Objective?

A. Distance between source and target sites
B. Customer's service level agreements
C. Network bandwidth costs
D. Time required to perform recovery
E. Cost of downtime

Answer: B, D, E

Question 6.
Your customer is looking to extend an existing local cluster to a remote cluster in an HP-UX environment. The configuration will be located in the same building but separated by multiple floors using a switched Fibre Channel. The customer has only Symmetrix devices for the operating system and application. 

Which consideration must be made to support this configuration?

A. Paging space devices cannot be configured on the Symmetrix
B. Operating System devices cannot failover
C. The lock disk would need to be reconstructed
D. A Lock disk cannot be a Symmetrix SRDF device

Answer: D

Question 7.
ARK Insurance has an IBM ESS (Shark) and two Symmetrix 8830s. ARK wants to move an application off of the IBM Shark on to one of the 8830s. The shark will eventually be replaced with a Symmetrix DMX. Ark wants to move the data before purchasing the DMX. ARK wants to use host based mirroring to move the data off of the Shark. The current configuration consists of 200 - 4GB drives spread across 8 Volume Groups. ARK is migrating to the Symmetrix that has a standard split size of 6GB. 

What is the minimum number of Symmetrix Logical Volumes that must be available on the Symmetrix for the migration?

A. 104
B. 148
C. 133
D. 136

Answer: D

Question 8.
DRV Corporation plans to utilize Open Replicator to migrate several devices from the Production array to the Target Array using a push. DRV will use the Online mode of operation. 

Which two [2] conditions are correct? 

Exhibit:
 

A. All target devices should be available to local source directors (FAs)
B. Can PUSH data to a max of 8 remote target devices
C. The COFW penalty will be applied to the Production devices
D. The host may not run I/Os to the source device
E. The target device must be online to it's host

Answer: A, C

Question 9.
In an SRDF/S solution implementation, what is the primary impact to the application which must be considered for distance and bandwidth requirements? 

A. Non-SRDF writes to the Symmetrix
B. Increased I/O service time
C. Protocol converter/channel extender delay
D. TimeFinder activity in the Symmetrix

Answer: B

Question 10.
GZR Corporation has a large Oracle data warehouse that extends across multiple Symmetrix arrays. Replication Manager will be utilized to create a replica for backups. Because of the custom application, pre- and post-processing scripts are required. The database must be brought offline prior to the split. 

Which three [3] conditions are required to successfully create a replica?

A. No special Post-Processing commands are required
B. No special Pre-Processing commands are required
C. Post-Processing scripts need to contain thaw or startup commands
D. Pre-Processing scripts need to contain freeze or shutdown commands
E. Oracle archive mode is not required
F. Oracle archive mode is required

Answer: C, D, E



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.