|
Question 1. In an environment that includes both a Master Domain Manager (MDM) and Backup Master Domain Manger (BMDM), which two options are appropriate for the location of the database? (Choose two.) A. Local database installed on the MDM only B. Live local database installed on the BMDM only C. Single database on a clustered machine remote from the MDM and BMDM D. Live database installed on a single Fault Tolerant Agent within IBM Tivoli Workload Scheduler network E. Live database on MDM and High Availability Disaster Recovery/Data Guard standby database on BMDM Answer: C, E Question 2. Which two commands are used to migrate IBM Tivoli Workload Scheduler to version 8.5 on a UNIX system? (Choose two.) A. launch.sh B. wdinstspb C. SETUP.bin D. twsinst -migrate E. SETUP.bin -silent Answer: C, E Question 3. When building the job stream MASTER#NEW_STREAM in the composer command line, which option should be used to apply the settings in the Variable Table "LIVE_VARS" to be associated to the jobs in the job stream? A. SCHEDULE MASTER#NEW_STREAM VARTABLE LIVE_VARS ON RUNCYCLE DAILY "FREQ=DAILY" : B. SCHEDULE MASTER#NEW_STREAM ON RUNCYCLE DAILY "FREQ=DAILY" : JOBVARTABLE LIVE_VARS C. SCHEDULE MASTER#NEW_STREAM USE VARIABLE_TABLE=LIVE_VARS ON RUNCYCLE DAILY="FREQ=DAILY" : D. SCHEDULE MASTER#NEW_STREAM ON RUNCYCLE DAILY="FREQ=DAILY" JOBVARTABLE=LIVE_VARS : Answer: A Question 4. What is the correct command to stop the currently executing job "test" in JOBS job stream on a local machine? A. conman "k test" B. conman "cj test" C. conman "kjobs.test" D. conman "cj jobs.test" Answer: C Question 5. Which IBM Tivoli Workload Scheduler report will provide the job history? A. rep2 B. rep3 C. rep7 D. rep8 Answer: C Question 6. In which order are job stream / job dependencies resolved? A. Predecessor - start time - prompt - file - resource B. Start time - prompt - predecessor - resource - file C. Prompt - predecessor - start time - file - resource D. File - start time - prompt - resource - predecessor Answer: A Question 7. Which report will provide information on the most recently completed plan? A. Report 08 - Job Histogram B. Report 07 - Job History Listing C. Report 10B - Actual Production Detail D. Report 11 - Planned Production Schedule Answer: C Question 8. Which command is issued on an IBM Tivoli Workload Scheduler master to determine link status and collect into a user created report? A. netstat -rn >B. conman "sc" > C. conman "show links" > D. conman "disp lnk status" > Answer: B Question 9. After making changes to the monitoring configuration file for the event monitoring engine on an agent, which conman command will force the change immediately? A. loadconf B. resetconf C. deployconf D. deploymonman Answer: C Question 10. How can a Job with EXEC as Internal Status be stopped in the Job Scheduling Console? A. Select Kill from the menu B. Select Release from the menu C. Select Cancel Job from the menu D. Select Cancel Pending from the menu Answer: A Question 11. An IBM Tivoli Workload Scheduler administrator finds that most of the job streams are carried forward during each production day. Which action should the administrator take to ensure that only a few job streams need to be carried forward? A. Change start of day B. Disable the Carry Forward option C. Cancel all job streams before start of day D. Administrator does not have to take any action Answer: A Question 12. User "twsuser" is logged on to the IBM Tivoli Workload Scheduler Master Domain Manager server using Job Scheduling Console to update calendar. The user receives a message: MODIFY on CALENDAR access not granted. What is the cause of this error? A. Batchman process is down. B. User password has expired. C. WebSphere security is damaged. D. There are insufficient permissions in Security file. Answer: D Question 13. What are two circumstances for which it may be advisable to use the silent uninstallation method instead of an interactive method? (Choose two.) A. The Administrator is unable to successfully export DISPLAY to a remote server. B. IBM Tivoli Workload Scheduler is installed on a server for which there is no console access. C. DNS is not working properly and the server cannot be accessed remotely to run the uninstallation script. D. TCP on the server on which IBM Tivoli Workload Scheduler is installed is configured for Halfduplex rather than full-duplex. E. The remote IBM Tivoli Workload Scheduler server is multi-homed, thus the return connection to IBM Tivoli Workload Scheduler cannot be established thereby requiring the use of the silent uninstaller. Answer: A, B
Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.