Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "HP0-628" Exam

Implementing HSx80 Compaq Storage

 Question 1.
What is the maximum number of supported cache modules in an MA8000 storage subsystem?

A. 1
B. 2
C. 3
D. 4

Answer: B

Question 2.
Where is the first place that data are stored after arriving in the HSG80 controller?

A. disk
B. cache
C. NVRAM
D. static memory

Answer: B

Question 3.
Exhibit:

 

What number matches the cache module used by the top HSG80 controller?

A. 1
B. 2
C. 3
D. 4
E. 5

Answer: E

Question 4.
How many device-side single-ended SCSI buses does the HSG80 controller support?

A. 2
B. 6
C. 7
D. None, all buses are differential.

Answer: B

Question 5.
What is the maximum number of Storage Works Model 4354 device enclosures supported by the HSG80?

A. 1
B. 3
C. 4
D. 6

Answer: B

Question 6.
How many 1.0 inch disk drives are supported in the Storage Works Model 4350 device enclosure?

A. 8
B. 10
C. 14
D. 50

Answer: B

Question 7.
What is the maximum number of fan modules supported in the M2200 shelf?

A. 1
B. 2
C. 3
D. 4

Answer: C

Question 8.
Under normal operating conditions, the reset button on the Operator Control Panel (OCP) of an HSG80 controller_______ .

A. remains off
B. remains on
C. turns amber
D. blinks once per second

Answer: D

Question 9.
Exhibit:

 

If the first four LEDs in the exhibit are on solid, what is the condition of the controller?

A. Controller is running.
B. Controller has a fault.
C. Controller is shut down.
D. Ports 1, 2, 3 have mis-configured drives.

Answer: C

Question 10.
What does the green LED in the shape of a canister on a universal drive indicate?

A. drive is idle
B. drive activity
C. drive has failed
D. drive is operational

Answer: D

Question 11.
What does the green arrow shaped LED pointing down on a universal drive indicate?

A. drive is idle
B. drive activity
C. drive has failed
D. drive is operational

Answer: B

Question 12.
What is the maximum number of physical disk devices allowed within a Storage Works MA8000 subsystem configured with dual-bus drive enclosures?

A. 14
B. 42
C. 72
D. 84

Answer: B

Question 13.
What is the maximum number of physical disk devices allowed within a Storage Works MA8000 subsystem configured with single-bus drive enclosures, running ACS v8.5?

A. 14
B. 42
C. 72
D. 84

Answer: C

Question 14.
What is the default setting for stop bits when configuring a serial communications link to use the CLI?

A. 0
B. 1
C. 2
D. 8

Answer: B

Question 15.
Which three types of connections can be used to issue CLI commands to the HSG80? 
(Choose three.)

A. SCSI
B. serial
C. fabric
D. Ethernet

Answer: A, B, D

Question 16.
Which CLI command is used to remove unwanted error information that appears every time a command is entered at the HSG80 prompt?

A. clear cli
B. show errors
C. remove errors
D. clear errors this controller

Answer: A

Question 17.
Exhibit:

 

What is the Port, Target, and LUN of the drive in the MA8000 in the exhibit that is marked with an X?

A. Port 1, Target 8, Lun 0
B. Port 1, Target 0, Lun 9
C. Port 1, Target 9, Lun 0
D. Port 8, Target 1, Lun 0

Answer: C

Question 18.
Which two SCSI bus IDs are NOT used in a model 4314 disk enclosure? (Choose two.)

A. 0
B. 1
C. 6
D. 7
E. 14
F. 15

Answer: C, D

Question 19.
The MA8000 identifies disk drives by their Port, Target, and LUN. What does port refer to?

A. SCSI ID
B. always 0
C. host bus adapter ID
D. internal SCSI bus number

Answer: D

Question 20.
ITCertKeys.com has a single controller HSG80 subsystem. 

What command is used to create an area on a disk to save the configuration?

A. save disk50000 configuration
B. save configuration disk50000
C. initialize disk50000 configuration
D. initialize disk50000 save configuration

Answer: D


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for 000-061 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "000-061" Exam

IBM Dynamic Infrastructure Technical Support Leader

 Question 1.
A manufacturing customer is not concerned about system failure, they believe heir 2 week manufacturing cycle allows for recovery. You wish to identify an opportunity for business esilience. 

Which of the following is the impact of system failure?

A. Automated recovery capabilities
B. Redundant servers
C. Quality of Service
D. Resource utilization

Answer: C

Question 2.
Identifying each customer recovery and budget requirements is an important first step in a Business Resilience (BR) engagement. A customer determines they have anRTO of 2-6 hours.

Which of the following addresses this BR requirement?

A. Continuous availability, end to end automation
B. Rapid data recovery
C. Tape based backup and restore
D. Real time data and server replication

Answer: B

Question 3.
A fundamental driver for the efficiency of any server is the level of utilization that is achieved. 

What are the typical current utilization levels for various processor types and what should be done to increase this utilization?

A. Mainframe 80%
B. Unix >50%
C. X86 >10%
D. Mainframe 100%
E. Unix >40%
F. X86 >10%
G. Mainframe >80%
H. Unix 15-25%
I. X86 <10%
J. Mainframe >80%
K. Unix >50%
L. X86 >20%
M. Application provisioning

Answer: C

Question 4.
Estimating resources can be the most difficult task in the performance-planning process. 

What are the components that the NEDC Technical Leader should be primarily interested in?

A. CPU time, disk access rate, LAN traffic, amount of real memory
B. Disk access rate, number of simultaneous users, number of concurrent batch jobs
C. Paging rate, CPU time, networking bandwidth
D. CPU clock speed, operating system type and communication I/O

Answer: A

Question 5.
A large manufacturing customer datacenter has reached its physical limits. 

A Which of the following is the key element in the Active Energy Strategy green agenda?

A. IT Management solution to monitor IT Assets
B. Facility monitoring into single portal
C. Smart management of IT devices, cooling systems and virtualization of infrastructure
D. A full chargeback suite for usage and accounting

Answer: C

Question 6.
A securities trading bank has a critical performance issue. Peaks in trading behavior temporarily result in a huge number of orders which must be processed in time to avoid penalties. 

Which of the following meets this immediate situation?

A. IBM SAN Volume Controller provides outstanding performance. Develop a virtualized 
    architecture with the customer to leverage caching properties to meet the
B. IBM server technology withCUoD
C. Analyze the business application; providing high performance solutions for a few peaks is not 
    cost
D. affective. Suggest your customer negotiate the service levels
E. Identify the real issue and develop the proper solution combining software, hardware and 
    services out of IBM comprehensive portfolio.

Answer: B

Question 7.
A prospect is confused with the multiple pillars (BR, EE, VC, and II) within the NEDC strategy. They are interested in virtualization and consolidation, but are concerned that too many pillars will result in a compromise and a poor solution. 

Which of the following is an effective response?

A. The pillars are interrelated and should be implemented together for maximum benefit
B. NEDC Innovation Workshop will help them identify which pillars are most critical and create a 
    roadmap for implementation of one or more pillars
C. NEDC pillars should be implemented one at a time like most applications, combining them as 
    goals makes implementation very difficult
D. Select the most urgent with the highest ROI. Once a successful track record is established 
    other pillars should be implemented

Answer: D

Question 8.
Following successful implementation of a NEDC project, the customer is concerned all of the objectives were not achieved. 

Which of the following would provide a check point for the project objectives for comparison?

A. NEDC Innovation Workshop
B. Scorpion study
C. Technical and Delivery Assessment
D. Team Solution Design

Answer: A

Question 9.
An IBM Solution Assurance Review (SAR) is conducted to facilitate which of the following? 

A. Expectations and assignment of responsibilities for a project
B. Confirms appropriate IBM hardware configuration
C. Ensure proper stakeholder support within an organization
D. Qualifies the Business Partner for Special Bid Pricing

Answer: A

Question 10.
One important factor in developing any BR strategy is to determine the customer Recovery Point Objective.

Which of the following defines a business RPO?

A. RPO indicates how much data the business canhafford to recreate (or lose)
B. RPO denotes the time interval between an outage and when the remote servers are available
C. RPO is the length of elapsed time that the business has agreed they can afford to be without 
    their systems and critical business applications
D. RPO is the distance between the product data centers and the recovery site

Answer: A



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.