Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "1Z0-311" Exam

Taking exam next week

 Taking exam next week
plz help me 
thanks


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for HP0-K02 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "HP0-K02" Exam

Implementing HP BladeSystem

 Question 1.
Which function does the Onboard Administrator perform in the BladeSystem c-Class? (Select two.)

A. configures and troubleshoots the server blade
B. manages connections to the interconnect modules
C. activates Remote Deployment Pack (RDP) when an in-service server fails
D. automates the process of deploying server operating systems and software
E. drives all management features through the Inter-Integrated Circuit (I2C) and Intelligent
Chassis Management Bus (ICMB) interfaces

Answer: B, E

Question 2.
Which options properly power down a c-Class blade server? (Select two.)

A. Use the virtual power button selection through iLO2.
B. Remove the c-Class blade server from the enclosure.
C. Use the virtual power button selection through RILOE II.
D. Switch off the power supplies on the back of the c7000 enclosure.
E. Press and hold the Power On/Standby button for more than 4 seconds.

Answer: A, E

Question 3.
What happens if you install extra fans in bays of a c7000 BladeSystem enclosure in such a way that they do not meet the next higher fan rule?

A. The enclosure will shut down.
B. The new fans will spin up and run at full speed.
C. The red LED will start blinking on the new fans.
D. The new fans will be marked with location errors.

Answer: D

Question 4.
Which LED indicator shows a fan failure?

A. solid blue
B. solid red
C. solid green
D. solid amber

Answer: D

Question 5.
What is the correct way of removing an active cool fan from a c-Class enclosure?

A. Lift the handle upwards and pull the fan from the enclosure.
B. Turn the handle on the fan counterclockwise and remove the fan.
C. Remove the four screws securing the fan and lift it out of the enclosure.
D. Remove the power connector from the fan and lift the fan out of the chassis.

Answer: B

Question 6.
Which port on a BladeSystem c-Class enclosure serves as a service port for temporary connection to a PC?

A. USB port
B. serial port
C. enclosure link-up port
D. enclosure link-down port

Answer: C

Question 7.
Exhibit:
 

You want to enable direct FC SAN connectivity on a c7000 enclosure. 

Where must you install the primary fabric switch?

A. Position 6
B. Position 18
C. Position 21
D. Position 22

Answer: C

Question 8.
Which features are available in Instant Support Enterprise Edition (ISEE) Advanced? (Select three.)

A. monthly OS update and patch downloads
B. real-time hardware event monitoring and automated notification to the HP 3rd level support
C. event management and fault detection to enhance Support Point of Presence (SPOP) 
    availability
D. comprehensive enterprise view of open incidents, history, installed clients, client status, and 
    contact information
E. convenient central point of administration through an HP owned and maintained Support Point 
    of Presence (SPOP) server installed at the customer site

Answer: C, D, E

Question 9.
Which HP service offering provides a two-hour response time for software issues and a four-hour response time for hardware issue resolution?

A. Proactive 24
B. HP Support Plus
C. HP Support Plus 24
D. Software Plus Support Service

Answer: A

Question 10.
What should a customer do before calling for service during the warranty period?

A. Install the ISEE software to automatically log the event.
B. Order a Care Pack online to have service on the same day.
C. Download the maintenance and service guide for the server.
D. Run diagnostics and install the latest firmware, drivers and patches.

Answer: D


Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.