Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "310-090" Exam

All Recent Dumps

 All Recent Dumps
i need latest dump
plz ad it
thanks


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for 642-770 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "642-770" Exam

Operational Foundations for Cisco Service Provider Core Networks (OFCN)

 Question 1.
Which two-stage configuration process is correct in Cisco IOS XR Software?

A. Enter configuration mode, then make configuration changes.
B. Make configuration changes, then enter "commit" to make configuration changes persist.
C. Make configuration changes, then enter "copy run start" to make configuration changes persist.
D. Enter admin mode, then make configuration changes.

Answer:  B

Explanation:

Question 2.
Which command displays the target configuration in Cisco IOS XR Software?

A. show config
B. show running-config
C. show config running
D. show config merge

Answer:  A

Explanation:

Question 3.
What will happen if a new version of Cisco IOS XR Software is installed and activated, and then the router reloads?

A. When the router comes back, the new version is loaded and the old and new versions are on disk0.
B. When the router comes back, the new version is loaded and only the new version is on disk0.
C. When the router comes back, the old version is loaded and the old and new versions are on disk0.
D. When the router comes back, the old version is loaded and only the old version is on disk0.

Answer:  C

Explanation:

Question 4.
When is it appropriate to use the commit replace command?

A. When you want to replace the existing configuration for an ipv4 address on an interface.
B. When you want to replace all configurations under router ospf.
C. When you want to replace the entire running configuration with the target configuration.
D. The commit replace command does the same as the commit command.

Answer:  C

Explanation:

Question 5.
Refer to the exhibit.
If all else are good, where could the problem be if a user in the 192.168.0.0/16 subnet reports that they are not able to connect to the router using Telnet?

A. MPP should be configured as out-of-band.
B. Interface GigabitEthernet0/2/0/1 should allow 192.168.0.0/16 address space when using Telnet.
C. Telnet traffic is going through other interfaces that are not configured in MPP.
D. Interface GigabitEthernet0/2/0/0 should allow 192.168.0.0/16 address space.
E. SNMP peer is not configured to "allow" on interface GigabitEthernet0/2/0/1 which prohibits Telnet

Answer:  C

Explanation:

Question 6.
At which SONET layer would you expect to see B3 errors?

A. physical
B. segment
C. line
D. path

Answer:  D

Explanation:

Question 7.
What is a common cause of increasing NEWPTR errors on a POS interface?

A. dirty fiber
B. incorrect timing
C. Tx and Rx swapped
D. wrong fiber type

Answer:  B

Explanation:

Question 8.
What is the range of DLCIs that are available for subscribers to configure on a Cisco IOS Frame Relay subinterface?

A. 0-1024
B. 1-2048
C. 0-991
D. 16-1007

Answer:  D

Explanation:

Question 9.
What is the acronym commonly used to identify a prearranged agreement between a service team and an external service provider?

A. SLA
B. OLA
C. UC
D. SLM
E. CICS

Answer:  C

Explanation:

Question 10.
According to the ITIL® v3 framework, a change that has an "approved" status has met which criteria?

A. The lab testing and operational assessments have been completed, and the change has been approved and committed to the change scheduler.
B. The operational testing and technical assessments have been completed, and the change has been approved and committed to the change scheduler.
C. The business and technical assessments have been completed, and the change has been approved and committed to the change scheduler.
D. The lab testing and technical assessments have been completed, and the change has been approved but is not yet committed to the change scheduler.

Answer:  C

Explanation:


Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.