Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "640-821" Exam

Please keep up to date

 Please keep up to date 
u must visit itcertkeys.com
it is rocking site
thanks


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for HP0-085 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "HP0-085" Exam

Planning and Designing HP Superdome Server Solutions

 Question 1.
Which rule governs how you should load I/O cards in the IOX cabinet?

A. Fill the I/O chassis completely before installing I/O cards in the IOX cabinet.
B. After you have filled a spare I/O chassis, install redundant I/O devices in the IOX cabinet.
C. For high-availability installations, redundant I/O cards should be installed in the IOX cabinet.
D. Distribute I/O cards evenly between the I/O chassis and the IOX cabinet to maximize bandwidth.

Answer: A

Question 2.
Which statements are true? (Select two.)

A. Processors of different speeds can be mixed in the same cell.
B. Superdome servers support mixing chipsets if they are in different cells.
C. An HP Superdome server can support only one type of chipset at a time.
D. Intel Itanium 2 and mx2 processors can be mixed in the same Superdome server.
E. Processors on the same cell board can be running different firmware versions if they are in separate hard partitions (nPars).

Answer: C, D

Question 3.
Which layered applications are included in the Enterprise Operating Environment? (Select two.)

A. Online JFS
B. Mirrordisk/UX
C. Data Protector
D. Workload Manager (WLM)
E. Enterprise Cluster Toolkit

Answer: A, B

Question 4.
Which resources are required for an nPar I/O chassis in an sx2000 Superdome server? (Select two.)

A. Tape drive
B. Core I/O card
C. Instant Capacity (iCAP) cell
D. Card connected to boot media
E. Card connected to removable media

Answer: D, E

Question 5.
What information does a Guardian Service Processor (GSP) or Management Processor (MP) provide about an HP Superdome server? (Select two.)

A. event logs
B. console logs
C. server power usage
D. processor utilization percentages
E. service level objectives (SLOs) for each partition

Answer: A, B

Question 6.
How should memory be loaded on an sx2000-based Superdome server to obtain best performance?

A. Use double data rate (DDR) DIMMs.
B. Populate one full quadrant at a time.
C. Populate the same echelons on each of the four quadrants.
D. Populate the A echelons on each of the cells, then populate the B echelons.

Answer: C

Question 7.
The best performance is achieved when partitions have how many cells? (Select two.)

A. two
B. three
C. four
D. five
E. six

Answer: A, C

Question 8.
How many HP Superdome servers can you manage with one Support Management Station (SMS)?

A. 8
B. 16
C. 24
D. 32

Answer: B

Question 9.
How can you set how much memory in an HP Superdome is cell local memory, and how much is interleaved memory? (Select two.)

A. nPar commands
B. HP OpenView Operations
C. HP Partition Manager (parmgr)
D. HP Systems Insight Manager (HP SIM)
E. These values are configured at the factory and cannot be changed without changing cell boards.

Answer: A, C

Question 10.
Which business values does HP Workload Manager (WLM) provide by allowing customers to set service level objectives (SLOs)? (Select two.)

A. increase performance
B. efficient resource utilization
C. activate spare processor capacity
D. run multiple workloads on one system
E. maximum system uptime and availability

Answer: B, D



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.