Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us

 Home

 Search

Latest Brain Dumps

 BrainDump List

 Certifications Dumps

 Microsoft

 CompTIA

 Oracle

  Cisco
  CIW
  Novell
  Linux
  Sun
  Certs Notes
  How-Tos & Practices 
  Free Online Demos
  Free Online Quizzes
  Free Study Guides
  Free Online Sims
  Material Submission
  Test Vouchers
  Users Submissions
  Site Links
  Submit Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Online Training Demos and Learning Tutorials for Windows XP, 2000, 2003.

 

 

 

 





Braindumps for "920-238" Exam

Required latest dump

 plz ad it
thanks


Google
 
Web www.certsbraindumps.com


Braindumps: Dumps for MB3-234 Exam Brain Dump

Study Guides and Actual Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA


Advertise

Submit Braindumps

Forum

Tell A Friend

    Contact Us





Braindumps for "MB3-234" Exam

Great Plains 8.0 Manufacturing Applications

 
Question 1.
What type of extra fields can be defined for tracking additional information on a job?

A. Date Labels
B. Check box Labels
C. Numeric Labels
D. Dollar Labels

Answer: A, B, C, D

Question 2.
Which item below is a Job Costing “element”?

A. Data collection entry
B. An engineering change
C. A forecast
D. A routing

Answer: A

Question 3.
In manufacturing job costing, how is an “element” defined?

A. A job costing palette icon
B. A record that can be linked to a job
C. A revenue or expense code
D. A job costing report

Answer: B

Question 4.
Which of the following links can be applied to a job with a “Closed” status?

A. Accounts payable transactions
B. Accounts receivable transactions
C. inventory transactions
D. No transactions can be linked

Answer: D

Question 5.
Which item(s) below is a Job Costing element°?

A. An inventory transaction
B. A receiving line
C. A payables transaction
D. A MRP run

Answer: A, B, C

Question 6.
Which of the following statements are true regarding ECM warnings?

A. The warnings can stop further activity if configured not to allow access
B. The warnings are set up per module
C. ECM warnings will give you options to continue, quit, or view ECM details
D. There are no warning messages for ECM

Answer: B, C

Question 7.
What is the typical sequence of ECM statuses?

A. New, Open, In Review, Closed
B. In Review, Approved, Done
C. New, In Review, In Approval, Updating, Done
D. In Review, ECM approved, Complete

Answer: C

Question 8.
Which ECM status notifies users of pending changes when trying to access an item?

A. Released
B. Active
C. Updating
D. Warnings

Answer: C

Question 9.
If it doesn’t matter what order the ECM Routing is processed, what system preference option should be checked?

A. Only allow users in Routing to edit ECR
B. Allow override on Routing signoff
C. Ignore Routing Order
D. Reset Change Routing when ECR is modified

Answer: C

Question 10.
Which one of the following can have warnings enabled?

A. Manufacturing Orders
B. Sales Orders
C. Inventory Item Engineering Card
D. Inventory Adjustments

Answer: D



Google
 
Web www.certsbraindumps.com


Study Guides and Real Exam Questions For Oracle OCP, MCSE, MCSA, CCNA, CompTIA





              Privacy Policy                   Disclaimer                    Feedback                    Term & Conditions

www.helpline4IT.com

ITCertKeys.com

Copyright © 2004 CertsBraindumps.com Inc. All rights reserved.